Home >

Assembly And Routine Maintenance Of Sewing Equipment

2013/4/22 9:05:00 37

Sewing EquipmentEquipment MaintenanceSewing Equipment Assembly

< p > < a > href= > //www.sjfzxm.com/news/ > strong > maintenance knowledge of sewing equipment < /strong > /a > strong > /strong > /p >


< p > equipment maintenance usually contains two meanings, one is the meaning of preventive maintenance, the other is the meaning of production and maintenance.

< /p >


< p > preventive maintenance means that regular inspection or regular nursing should be carried out before mechanical failure occurs.

< /p >


< p > the so-called production and maintenance is to reduce production costs and improve product quality maintenance.

< /p >


< p > sewing > a href= "//www.sjfzxm.com/news/index_c.asp" > equipment < /a > three level maintenance < /p >


< p > maintenance of sewing equipment depends on everyone, giving full play to their enthusiasm and implementing scientific management and effective maintenance of equipment.

< /p >


< p > 1, daily maintenance < /p >


< p > the daily maintenance of sewing equipment is carried out by the operator, and the equipment is carefully inspecting the equipment before class or 5~10 minutes after class. The key equipment is carefully checked by 10~15 minutes before class or after class.

It is also required to wipe all parts of the machine and add lubricating oil so that the equipment is kept neat, tidy, lubricated and safe.

The equipment in the class is out of order and eliminated in time.

< /p >


< p > 2, first class maintenance < /p >


< p > machine operation for one month (one shift) needs one level of maintenance.

The first level maintenance is performed by the operator, and the machine maintenance worker guidance is carried out. Local dismantling and checking of the required parts are carried out according to the requirements, dredging the oil and pipeline, clearing the oil line, linoleum and oil filter, adjusting the positioning of each part of the equipment, matching the clearance, fastening the loosening screws.

< /p >


< p > 3, two maintenance < /p >.


"P > two" maintenance is responsible for the first class maintenance. It is responsible for the machine repair and maintenance workers, once every other year, partial disintegration inspection and repair of the equipment, replacement or repair of wear parts, cleaning, oil change, inspection and repair electrical parts, local recovery precision, meet the requirements of the normal operation of the machine.

< /p >


< p > < a > href= > //www.sjfzxm.com > > strong > two important details of sewing machine assembly < /strong > /a > strong > /strong > /p >


< p > sewing machine assembly for the first time or assembly after heavy repair has great influence on the performance of the equipment.

The sewing machine with poor assembly quality has low precision, poor performance, loud noise, heavy torque and short life. On the contrary, some parts with very low precision can be assembled with better performance by careful assembly and precise adjustment.

< /p >


< p > during the assembly process, some links are easy to be ignored, which often causes obvious influence on the assembly quality and needs attention.

< /p >


< p > 1. To ensure the cleanliness of parts, < /p >


By cleaning and cleaning carefully, ensuring the cleanliness of sewing machine parts is the basis for ensuring the assembly quality and prolonging the service life of the sewing machine. < p >

In particular, the shaft sleeve, bearings, oil pumps, and parts with rotating and swinging parts should be carefully cleaned.

< /p >


< p > if the shaft assembly is not clean, the axle sleeve will be heated too high and the pmission torque is too heavy. In severe cases, it will cause accelerated wear and tear due to debris.

< /p >


< p > two, according to program operation < /p >


< p > the surface of sewing machine parts such as surface baking, electroplating and so on, there are sticky layers in the assembly joint surface (including holes, grooves, planes and screw holes). Therefore, before assembly, the parts must be processed according to the technological requirements, and can be processed in advance until they can enter the assembly state.

< /p >


< p > If assembly fails to meet the specified technical requirements, < a href= "//www.sjfzxm.com" > sewing machine < /a > will not work properly.

The incorrect position between parts and mechanisms also affects the performance of sewing machines.

< /p >

  • Related reading

Upgrading Taiwan Shoe Machine To Upgrade Jinjiang Shoe Industry

Equipment matching
|
2013/4/22 8:09:00
33

Shishi Textile Machinery Should Seize The Opportunity Of Increasing Exports

Equipment matching
|
2013/4/21 8:03:00
21

Quilting Technology Has Gone Through 200 Years Of Extraordinary History.

Equipment matching
|
2013/4/21 8:03:00
39

High End Household Sewing Machine Equipment Brings Back Memories

Equipment matching
|
2013/4/19 15:32:00
64

China Light Industry Federation Awards For Science And Technology 2012

Equipment matching
|
2013/4/19 9:16:00
32
Read the next article

Introduction To Fabric Knowledge Of Bass Yarn And Hemp

The crepe weave is a thin fabric made of plain weave and a concave convex bubble. It has unique appearance, strong sense of three-dimensional structure, light texture, soft handle, non wearing, cool and comfortable, and no ironing after washing. Linen fabric has poor elasticity and is not suitable for structural design with tight fitting or large amount of exercise. The shrinkage of hemp fabric is large (similar to that of printed cotton cloth), and it needs to be soaked and pre contracted befor